The house is filled with drying, painted cabinet doors and regular doors. Thank goodness the weather had been warm and dry so the house can be opened up.
Here I'm in the office looking toward the front entry. Code required us to have a large step in the doorway, where the level steps down, because the door opens inward.
The whole downstairs has new wood floors.

Looking down from the stairs into the entry room, that's our front door with the 6 small windows in it. They rigged up an interesting rack to dry the doors on.

Cabinet doors drying in the guest room (Danu's old room):

Looking down from the stairs... lots of drawers drying in the living room:

Our wonderful tiled bathrooms...this is the upstairs bath.
We met with a second shower enclosure contractor and worked out the shower glass design. He can give us our perfect design in 1/2" glass for the same price another guy was charging for 3/8" glass, plus he seemed much more knowledgeable. The other guy we met with seemed to be new at it and couldn't advise us the way we needed.

Sunlight in the corner:

Downstairs bathroom. We chose semi-recessed sinks:



The mortar bed is laid for the tile hearth on the floor and the hearth that sticks out below the fireplace is partially ready.

I'm going to feel like a princess here.